CARBON REDUCTION PLAN

Supplier name: FLEXZO AI LIMITED

Publication date: November 2024

Commitment to achieving Net Zero

FLEXZO AI LIMITED is committed to achieving Net Zero emissions by 2040.

Baseline Emissions Footprint

Baseline emissions are a record of the greenhouse gases that have been produced in the past and were produced prior to the introduction of any strategies to reduce emissions. Baseline emissions are the reference point against which emissions reduction can be measured.

Baseline Year: 2024

Additional Details relating to the Baseline Emissions calculations.

FLEXZO AI LIMITED is dedicated to acknowledging and addressing the key environmental concerns it influences. Our commitment lies in consistently enhancing our performance in these areas:

  • encompassing energy reduction
  • minimised fuel consumption
  • minimal waste generation
  • maximal waste recycling
  • curbing pollution.

FLEXZO AI LIMITED Environmental and Energy Policy:

  • Tonnes of CO2e per number of FTE (full time equivalent) employees best represents our business intensity ratio.
  • Carbon emissions have been calculated in accordance with UK Government Environment Reporting Guidelines including Streamlined Energy and Carbon Reporting (SECR) guidance.
  • Consumption data has been taken from purchase invoices and motor vehicle mileage data.
  • Activity has been converted into carbon emissions using the published UK Government GHG Conversion Factors for Company Reporting 2020.

Baseline year emissions: 2024

EMISSIONS

TOTAL (tCO2e)

Scope 1

571

Scope 2

357

Scope 3

(Included Sources)

We are currently working on finalising our employee commuting emissions.

As a workforce technology solutions company, we believe these to be our only scope 3 emissions

Total Emissions

928*

* Scope 1 and 2 only

 

Current Emissions Reporting

Reporting Year: 2025

EMISSIONS

TOTAL (tCO2e)

Scope 1

TBC. 2024 was our baseline year following formation in 2023.

Scope 2

TBC. 2024 was our baseline year following formation in 2023.

Scope 3

(Included Sources)

TBC. 2024 was our baseline year following formation in 2023.

Total Emissions

TBC. 2024 was our baseline year following formation in 2023.

Emissions reduction targets by 2030

To continue our progress to achieving Net Zero, we have set the following carbon reduction targets for 2030.

  • Carbon emissions to decrease to below 450 tCO2e
  • This is a reduction of 48% against the 2020 baseline
  • Target to be reviewed each year as the impact of initiatives is realised

When developing our Carbon Reduction Plan we look to implement and adhere to best practice policies that embed and support Carbon Reduction Planning in support of Green Initiatives such as NHS Net Zero, as detailed within the Procurement Policy Note 06/21:

We have adopted UK Government and/or NHS targets for sustainable development where appropriate, in full consideration of the environmental impacts of any significant policy decisions and requirement to achieve Carbon Net Zero emissions in line with our target date). Sustainable development will include, but is not limited to:

  • Energy management
  • Water, to include system infrastructure maintenance and wastewater management
  • Waste prevention and management including waste hierarchy and segregation
  • Reducing single use plastics in accordance with the Environmental Protection (plastic straws, cotton buds and stirrers) (England) Regulations 2020, related Regulations in place across Devolved Administrations and all future waste related regulations; and
  • Minimising transport use.

We are not required to publicly report UK energy use and carbon emissions within the Supplier’s Director Report as we do not meet any two of the following three thresholds have been met in the preceding financial year, in alignment to the latest guidance published by the Department for Business, Energy and Industrial Strategy (BEIS):

  • A turnover of £36m or greater;
  • A balance sheet of £18m or greater; and/or
  • A company size of 250 employees or greater.

Completed Carbon Reduction Initiatives

As a relatively new organisation we are on the initial stages of our journey to Net Zero. We have developed a multi-year action plan which outlines the initiatives we will be undertaking to take us to our Net Zero position by no later than 2040. Our action plan contains a wide range of environmental management measures and projects including, but not limited to:

  • Training for our team
  • Engaging with our local community and supplychain
  • Biodiversity
  • Energy conservation measures
  • Green data storage

We include our net zero action plan below:

AREA

ACTIVITIES

KPI / OBJECTIVE

TIMESCALE FOR DELIVERY

MEASUREMENT

RAG (Red, Amber Green)

INTERNAL RESOURCES

EXTERNAL RESOURCES

ENGAGEMENT

MONITORING, REPORTING AND ASSESSING PERFORMANCE ISSUES

Carbon literacy training

Deliver carbon literacy training [4-hours per employee biannually] to raise awareness about the importance of carbon reduction and encourage the adoption sustainable practices at work/in their personal lives.

100% of FLEXZO AI employees to undertake training every two years.

31.03.2026

100%

 

Sustainability Executive Sponsor – will provide governance-level oversight, driving strategic integration of sustainability across all business functions.

Executive Senior Management Team – will set direction, allocate resources, and ensure that carbon neutrality and sustainability commitments are embedded into our operational and delivery frameworks.

Line Managers/Team Leaders – will play an active role in mentoring and supporting individuals engaged through carbon neutrality and sustainability pathways, ensuring integration into teams and tracking progress.

Individual team members – will be responsible for undertaking their designated actions within this action plan

Social Value Delivery Experts including:
– Carbon Neutrality and Sustainability Advisors – help develop and deliver carbon neutrality and sustainability programme
– Carbon Neutrality and Sustainability Trainers
– VCSE to support with community engagement
– Data storage providers
– Supplychain

We will engage with key stakeholders, including the Authority, social value beneficiaries and organisations within the VCSE, through regular meetings/surveys/collaborative workshops. This will ensure their voices are heard and valued throughout the process and we create a shared understanding of Social Value objectives and work together towards achieving meaningful outcomes

Monitoring and reporting on the delivery of Social Value requirements will ensure accountability and transparency in our initiatives. We will implement a robust framework that includes regular assessments, stakeholder engagement and clear reporting mechanisms. Our metrics will serve as benchmarks to evaluate our progress and impact effectively. Using Red, Amber, Green (RAG) traffic light system we will conduct monthly/quarterly reviews to track performance against these indicators, ensuring that we remain on target. Data collection will involve both quantitative metrics/qualitative feedback from beneficiaries, enabling us to gain a comprehensive understanding of our activities’ effectiveness.

To enhance our monitoring efforts, we will engage with relevant stakeholders. Regular stakeholder meetings will provide a platform for open dialogue, allowing us to gather insights, address concerns and adjust our strategies. We will compile regular reports summarising our findings/performance against KPIs/any challenges encountered. These reports will be shared with relevant stakeholders to maintain transparency/foster trust in our commitment to delivering Social Value.

In the event of performance issues, we will promptly initiate a corrective action plan. This plan will involve identifying the root causes of the issue, proposing actionable solutions and assigning responsibilities for implementation. We will communicate transparently with all stakeholders throughout this process, providing updates on progress and adjustments made.

31.03.2027

100%

31.03.2028

100%

31.03.2029

100%

31.03.2030

100%

31.03.2031

100%

31.03.2032

100%

31.03.2033

100%

ISO-14001 awareness

Deliver ISO-14001 awareness training annually

100% of FLEXZO AI employees to undertake training annually.

31.03.2026

100%

 

31.03.2027

100%

31.03.2028

100%

31.03.2029

100%

31.03.2030

100%

31.03.2031

100%

31.03.2032

100%

31.03.2033

100%

Energy Management

Transition to renewable energy sources for all our electricity needs by 2028 and then maintain this renewable power usage.

100% of FLEXZO AI power usage from renewable sources by 2028.

31.03.2026

50%

 

31.03.2027

75%

31.03.2028

100%

31.03.2029

100%

31.03.2030

100%

31.03.2031

100%

31.03.2032

100%

31.03.2033

100%

Water, to include system infrastructure maintenance and wastewater management

 

Undertake a water usage audit across FLEXZO AI to identify areas of high usage

31.03.2026

Audit completed

 

Implement a routine inspection schedule for plumbing fixtures, pipes, and appliances to identify leaks and inefficiencies.

31.03.2027

6-monthly inspections

Invest in water-efficient fixtures e.g. low-flow toilets, faucets

31.03.2028

Fixtures fitted

Install smart irrigation systems and rainwater harvesting systems to reduce reliance on potable water

31.03.2029

Fixtures fitted

Deliver Water Efficient Practices Training to all staff

31.03.2030

100%

Launch an internal campaign (posters, newsletters) highlighting the importance of conserving water and showcasing water-saving tips

31.03.2031

Campaign delivered

Deliver Water Efficient Practices Training to all staff

31.03.2032

100%

Install smart meters to continuously monitor water usage and identify unusual patterns that indicate leaks or inefficiencies.

31.03.2033

Fixtures fitted

Waste prevention and management including waste hierarchy and segregation

Deliver a ‘Waste Wise’ workshop annually to the FLEXZO AI team with an alternating focus on workplace and the home.

Workplace focus

31.03.2026

1 workshop lasting 3 hours

 

Home focus

31.03.2027

1 workshop lasting 3 hours

Workplace focus

31.03.2028

1 workshop lasting 3 hours

Home focus

31.03.2029

1 workshop lasting 3 hours

Workplace focus

31.03.2030

1 workshop lasting 3 hours

Home focus

31.03.2031

1 workshop lasting 3 hours

Workplace focus

31.03.2032

1 workshop lasting 3 hours

Home focus

31.03.2033

1 workshop lasting 3 hours

Reducing single use plastics in accordance with the Environmental Protection (plastic straws, cotton buds and stirrers) (England) Regulations 2020, related Regulations in place across Devolved Administrations and all future waste related regulations.

Reduce single use plastics across FLEXZO AI

Year on year decrease in the use of single use plastics until 100% is attained and then maintain this rate.

31.03.2026

50%

 

31.03.2027

75%

31.03.2028

100%

31.03.2029

100%

31.03.2030

100%

31.03.2031

100%

31.03.2032

100%

31.03.2033

100%

Maximising public transport use.

Increase % of journeys using public transport

Undertake audit of journeys by car and public transport undertaken by the FLEXZO AI team

31.03.2026

Complete audit

 

Increase % of journeys undertaken using public transport from audit baseline

31.03.2027

10%

31.03.2028

15%

31.03.2029

20%

31.03.2030

25%

31.03.2031

30%

31.03.2032

36%

31.03.2033

40%

Energy efficiency

Investing in energy efficiency improvements across all facilities, targeting a 20% reduction in energy consumption by 2030.

Invest in energy efficiency improvements in our facilities

31.03.2026

5%

 

31.03.2027

7.50%

31.03.2028

10%

31.03.2029

15%

31.03.2030

20%

31.03.2031

22%

31.03.2032

24%

31.03.2033

26%

Sustainable transport

Promoting sustainable transportation options for employees, including electric vehicle (EV) incentives and public transit subsidies, aimed at decreasing business travel emissions by 30% within five-year period.

Decrease business travel emissions by 30% within a 5-year period.

31.03.2026

Complete audit

 

31.03.2027

10%

31.03.2028

15%

31.03.2029

20%

31.03.2030

30%

31.03.2031

32%

31.03.2032

34%

31.03.2033

35%

Sustainable sourcing and procurement practices

Implement sustainable sourcing and procurement practices.

Assess our current procurement processes

31.03.2026

Completed

 

Define sustainability standards for suppliers

31.03.2027

Defined standards

Develop a sustainable procurement policy

31.03.2028

Developed policy

Implement the policy

31.03.2029

Implemented policy

Provide free resources to existing suppliers

31.03.2030

Resources provided

Monitoring

31.03.2031

Monitoring

Monitoring

31.03.2032

Monitoring

Monitoring

31.03.2033

Monitoring

Maintain ISO 14001 compliance

Maintain ISO 14001 compliance

Maintain accreditation and compliance

31.03.2026

Maintained

 

Maintain accreditation and compliance

31.03.2027

Maintained

Maintain accreditation and compliance

31.03.2028

Maintained

Maintain accreditation and compliance

31.03.2029

Maintained

Maintain accreditation and compliance

31.03.2030

Maintained

Maintain accreditation and compliance

31.03.2031

Maintained

Maintain accreditation and compliance

31.03.2032

Maintained

Maintain accreditation and compliance

31.03.2033

Maintained

Carbon Offsetting

To offset at least 100% of our remaining emissions by 2040 through verified reforestation, renewable energy projects, and community-based initiatives that provide social co-benefits.

Offset emmissions

31.03.2026

15%

 

Offset emmissions

31.03.2027

20%

Offset emmissions

31.03.2028

25%

Offset emmissions

31.03.2029

30%

Offset emmissions

31.03.2030

35%

Offset emmissions

31.03.2031

40%

Offset emmissions

31.03.2032

45%

Offset emmissions

31.03.2033

50%

Telecommuting and flexible work options

We encourage telecommuting and flexible work arrangements whenever possible and practicable to reduce our vehicular emissions

100% of employees supported to work flexibly where possible and practiable

31.03.2026

100%

 

31.03.2027

100%

31.03.2028

100%

31.03.2029

100%

31.03.2030

100%

31.03.2031

100%

31.03.2032

100%

31.03.2033

100%

Supplychain

Explore and implement collaborative ways of working with our supply chain to deliver additional environmental benefits in the performance of the contract, including working towards net zero greenhouse gas emissions

Complete a supplychain assessment and engagement process

31.03.2026

Enhanced collaboration with supplychain. Increased awareness & commitment to sustainability. Development of best practices and innovative solutions for ongoing environmental responsibility. Decrease in emissions.

 

Undertake a co-creation workshops with our supplychain to develop joint objectives

31.03.2027

Implement the agreed initiatives including monitoring and reporting of decrease in emissions

31.03.2028

31.03.2029

Hold a co-review workshop to discuss success and scaling

31.03.2030

Implement the scaled initiatives including monitoring and reporting of decrease in emissions

31.03.2031

31.03.2032

31.03.2033

Biodiversity

Explore and implement ways to enhance the natural environment such as habitat creation, increasing biodiversity such as pollinators

Biodiversity awareness training rolled out to all staff members

31.03.2026

100%

 

31.03.2027

Undertake site assessment and planning for FLEZXO AI estates and facilities

31.03.2028

Complete

31.03.2029

Implement our agreed habitat changes e.g. bug hotels, pollinator gardens

31.03.2030

Implemented

31.03.2031

Evaluation of habitat changes

31.03.2032

Evaluated

Scaling of successful schemes

31.03.2033

Implemented

Reconnecting with the environment

Explore, design and implement activities to reconnect our team and the wider community with the environment and increase awareness of ways to protect and enhance it.

Deliver awareness training to our internal team

31.03.2026

100%

 

Work with a VCSE organisation to engage with our local community via workshops, interviews and focus groups to identify reconnection opportunities

31.03.2027

1 workshop

31.03.2028

2 focus groups

31.03.2029

10 interviews

Deliver agreed opportunities within our local community e.g. sustainability challenges and competitions

31.03.2030

Implemented

31.03.2031

31.03.2032

Scaling of successful schemes

31.03.2033

Implemented

Volunteering

Explore volunteering opportunities for the contract workforce, e.g. undertaking activities that encourage direct positive impact

Implement a volunteer policy to enable each WTE staff member to undertake volunteer activities linked to the environment e.g. litter picks etc.

31.03.2026

1 day of volunteering per WTE staff member

 

31.03.2027

31.03.2028

31.03.2029

31.03.2030

2 days of volunteering per WTE staff member

31.03.2031

31.03.2032

31.03.2033

Green Data Storage

Maintain active engagement with AWS and Google Cloud to stay informed about their latest sustainability innovations and incorporate those solutions into our operations.

Maintain active engagement with AWS and Google Cloud to stay informed about their latest sustainability innovations and incorporate those solutions into our operations.

31.03.2026

Relationship maintained

 

31.03.2027

31.03.2028

31.03.2029

31.03.2030

31.03.2031

31.03.2032

31.03.2033

Green Data Storage

Explore emerging technologies such as storage-class memory and tape storage for long-term archival solutions to further reducing our carbon footprint
Utilising AI for Predictive Data Management: By leveraging artificial intelligence, we aim to better understand data usage patterns and optimise resource allocation accordingly to allow us to proactively manage our data storage needs, minimising energy waste and enhancing system performance.

Explore emerging technologies and utilising AI further within our operational processes.

31.03.2026

Emerging technologies explored, AI utilised more widely.

 

31.03.2027

31.03.2028

31.03.2029

31.03.2030

31.03.2031

31.03.2032

31.03.2033

Net Zero

Acheive NET ZERO by no later than 2040.

Year on year reduction in emissions from baseline year.

31.03.2026

15%

 

31.03.2027

18%

31.03.2028

30%

31.03.2029

39%

31.03.2030

48%

31.03.2031

53%

31.03.2032

58%

31.03.2033

63%

Declaration and Sign Off

This Carbon Reduction Plan has been completed in accordance with PPN 06/21 and associated guidance and reporting standard for Carbon Reduction Plans.

Emissions have been reported and recorded in accordance with the published reporting standard for Carbon Reduction Plans and the GHG Reporting Protocol corporate standard and uses the appropriate Government emission conversion factors for greenhouse gas company reporting.

Scope 1 and Scope 2 emissions have been reported in accordance with SECR requirements, and the required subset of Scope 3 emissions have been reported in accordance with the published reporting standard for Carbon Reduction Plans and the Corporate Value Chain (Scope 3) Standard9.

This Carbon Reduction Plan has been reviewed and signed off by the board of directors (or equivalent management body).

Signed on behalf of the Supplier:

 

HEALSGOOD AI LIMITED

JACK HENDERSON

Date: November 2024